冷再生機(jī)對瀝青路面改造的要求
來源:http://www.ebagshop.com.cn/ 日期:2022-12-30 發(fā)布人:
冷再生機(jī)是指瀝青路面就地冷再生是利用一體化的再生設(shè)備、添加材料、一 次拌和成型工藝,通過新鋪結(jié)構(gòu)面層,構(gòu)成舊路面改造新的一套完整體系。下面冷再生機(jī)出租廠家就來講解一下關(guān)于對瀝青路面改造的配置要求和準(zhǔn)備工作。
Cold recycling machine refers to the on-site cold recycling of asphalt pavement, which is a new complete system for the reconstruction of old pavement by using the integrated recycling equipment, added materials, and one-time mixing and molding process to pave the new structural surface. Next, the cold recycling machine rental manufacturer will explain the configuration requirements and preparations for asphalt pavement reconstruction.
準(zhǔn)備工作:
preparation:
再生前的各項(xiàng)準(zhǔn)備工作在施工前到位,確保工期正常進(jìn)行。主要內(nèi)容包括:人員準(zhǔn)備、機(jī) 械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。
All preparations before regeneration shall be in place before construction to ensure the normal progress of the construction period. The main contents include: personnel preparation, mechanical preparation, material preparation, traffic coordination and logistics support.
材料要求:
Material requirements:
水泥選用強(qiáng)度等級為32.5、初凝時間≥3h、終凝時間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥 。水泥應(yīng)具有良好的工作性、低水化、高后期強(qiáng)度、耐久性、耐腐蝕性和抗裂性能。
Portland or ordinary Portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h shall be selected. Cement shall have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.


機(jī)械要求:
Mechanical requirements:
工程施工過程通過再生機(jī)組來完成,再生機(jī)組包括:冷再生主機(jī)、水泥稀漿車、平地機(jī)、 壓路機(jī)等。
The construction process of the project is completed by regeneration units, including cold regeneration host, cement slurry truck, grader, roller, etc.
人員要求:
Personnel requirements:
工程技術(shù)人員及機(jī)械操作人員應(yīng)經(jīng)過冷再生培訓(xùn)并經(jīng)過考核合格后方可上崗。
Engineering technicians and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
工程協(xié)調(diào):
Project coordination:
作好施工總體計(jì)劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作 業(yè)面的遮擋。
The overall construction plan shall be prepared, and the half width construction without interruption of traffic shall be adopted. The traffic diversion work during the construction shall be done well, and the shelter of the construction working face shall be prepared.
冷再生機(jī)對瀝青路面改造的要求相關(guān)內(nèi)容就從以上所講中了解的,您有什么問題或者疑惑,可以隨時來我們網(wǎng)站http://www.ebagshop.com.cn進(jìn)行咨詢了解!
The requirements of cold recycling machine for asphalt pavement reconstruction are understood from the above. If you have any questions or doubts, you can come to our website at any time http://www.ebagshop.com.cn Ask about it!
閱讀/ Recommended reading
- 帶你了解冷再生機(jī)的使用方法 2025-05-07
- 選擇銑刨機(jī)租賃的優(yōu)勢?有哪些 2025-05-06
- 租壓路機(jī)該注意什么? 2025-05-04
- 道路施工怎么會少了冷再生機(jī),帶你了解租賃的好處 2025-05-03
冷再生機(jī)租賃對環(huán)境有要求嗎
[2018-08-23]
在建筑施工領(lǐng)域,冷再生機(jī)憑借其、、的特點(diǎn),成為舊路面改造與資源循環(huán)利用的重要設(shè)備。隨著租賃模式的普及,越來越多施工單位選擇租賃冷再生機(jī)完成工程。然而,冷再生機(jī)的正...